Project Creation Training

… continuation…

The second part in our method is the work on the mini projects. However, before some serious work it is necessary to concentrate attention of participants. The games called “Energizer” are exactly created to achieve this aim. The main role of them is: minimum of time and maximum of distraction.

The third game “Car wash”
 
Everybody has to find a pair and form a long column. Every pair has to make up their action, which helps them to “wash” any part of a car. First pair goes through whole column, at the same time others (they repeat the same actions) “wash” that pair. Then second pair goes through the column, then the third one…  The pairs, which had passed all the wash procedures, stand in the end of the column and repeat their actions.

Target: To concentrate people for serious work.

So,

After it all the participants are ready for the serious work.

Project Creation Training

1. Each participant creates some ideas for a project. 10 min
2. Each participant can exchange ideas with each other. 15 min
3. Ideas are grouped according to topics. 5 min

4. Participants divide into smaller groups (max. 5 persons)
according to topics.

5 min
5. Each group makes own project in order presented in the scheme:
1 hour
6. Each group prepares his presentation. 7 min

We consider this part is ended successfully. Our choice is following 5 topics: ART, SCIENCE, HEALTH and ENTERTAINMENT.

After a hard working day it is necessary for all participants to sit down in a circle and start to analyze:

  1. What do you feel?
  2. What about reception? Are you fully satisfied? May be do you want to change something?
  3. Do you have any remarks or desires?

To see the results, click on the flag…

European Project Group of Baltic States «VVV - Valga, Valka, Visaginas»